Skip to content

Execution that holds the schedule

We are not just a service provider — we are a site-driven execution partner known for taking over challenging, delayed, or partially executed jobs and delivering them within committed timelines.

Years of site execution

21+

Years of site execution

Continuously since 2005

Projects executed

82

Projects executed

For EPC majors and plant owners

Staff & workforce

500+

Staff & workforce

Engineers, fitters, IBR welders

Largest FGD package

2 × 660 MW

Largest FGD package

OPGC Jharsuguda, in progress

Why GEC

Built for the jobs nobody else will take

Contractors get replaced when a site stalls. We are usually the ones called in afterwards — which is why our capability is measured in mobilisation speed and recovery, not just scope.

  • Fast Mobilization

    Deployment of manpower within short notice.

  • Crisis Handling

    Proven ability to take over stalled or disputed sites.

  • Manpower Strength

    Skilled workforce adaptable to multi-discipline jobs.

  • On-Site Problem Solving

    Immediate engineering adjustments as per site conditions.

  • Target-Oriented Execution

    Commitment to milestone-based progress.

  • Cost Control

    Optimized execution without unnecessary overheads.

Project handling capability

  • Greenfield & Brownfield Projects
  • Shutdown & Breakdown Jobs
  • Balance Scope / Leftover Work Execution
  • High-Height & Congested Area Execution
Clients

Trusted by the contractors who build India’s plants

We work as an execution partner to EPC majors and directly for plant owners. Every name below appears in our project record.

  • Tata Steel
  • Thermax
  • Isgec Heavy Engineering
  • L&T Energy-Power
  • Thyssenkrupp Industries
  • Mitsubishi Power
  • Alstom Project India
  • Hamon Research Cottrell
  • PES Engineers
  • Essar Construction
  • Pennar Industries
  • DF Power System
  • Thermal Systems Hyderabad
  • Tata Power
  • Vedanta / Facor Power
  • Indure
  • Rungta Sons

Executed at plants of

  • Tata Steel
  • NTPC
  • Damodar Valley Corporation
  • OPGC
  • JSW Steel
  • Usha Martin
  • Aditya Birla Chemicals
  • Emami Cement
  • J.K. Paper
  • Singareni
  • HMEL
  • Shri Bajrang Power & Ispat
  • IMFA
Recent work

On site right now

Our current packages — a CFBC and WHR boiler revamp, an FGD absorber at 660 MW scale, and a 160 TPH CFBC boiler under erection.

  • Absorber shell section being lifted into position by crawler craneUnder progress

    1 x 140 TPH CFBC & 2 x 59.6 TPH WHR — Revamping

    Seraikela Steel Plant, Seraikela, Jharkhand

    Rungta Sons Pvt. Ltd., Seraikela, Jharkhand · 2026

  • Erected absorber shell with outlet duct in place at the OPGC Jharsuguda FGD projectUnder progress

    2 x 660 MW FGD — Absorber & Outlet Duct

    OPGC, Jharsuguda, Odisha

    Isgec Heavy Engineering Ltd., Noida, U.P. · 2025-26

  • Boiler structural framework with steam drum at Shri Bajrang Power & Ispat, TildaUnder progress

    1 x 160 TPH CFBC Boiler

    Shri Bajrang Power & Ispat Ltd., Tilda, Raipur

    Shri Bajrang Power and Ispat Ltd., Raipur · 2026

Industries

Where we work

Two decades across heavy process industry — most of it inside live, operating plants.

  • Thermal Power Plants

    Boilers, ESPs and FGD absorbers for utility and captive power — from 10 TPH WHRBs to 2 × 660 MW units.

  • Steel & Metal Industries

    Two decades inside Tata Steel Jamshedpur alone — sinter plant APC, power house boilers, gas pipelines and SMS structures.

  • Cement Plants

    Waste heat recovery boiler packages, preheater and AQC boilers with ESPs and auxiliaries.

  • Chemical & Process Units

    CFBC boilers, ESPs and process piping for chemical, paper and sugar process plants.

Get in touch

Have a package that has to move?

Send us the scope and the date it has to be handed over. We will tell you what it takes to hit it — and mobilise within days, not weeks.