  • #1Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of Boiler 1 x 38 TPH WHRB at Viraj Steel & Energy Ltd., Sambalpur, Orissa.

    Boiler2005-06
  • #2Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of AFBC Boiler 1 x 41 TPH at Kohinoor Steel Plant Ltd., Kandra, Jharkhand.

    Boiler2006-07
  • #3Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection & Commissioning of Boiler 1 x 120 TPH Boiler and ESP at AB Sugar Mills, Dashha, Hoshiarpur, Punjab.

    BoilerESP2007-08
  • #4Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Dismantling & Erection of Economizer Coil, 1 x 55 TPH WHRB Boiler Shutdown job at Tata Sponge Iron Ltd., Joda, Odisha.

    BoilerDismantling2007-08
  • #5Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of 1 x 140 TPH AFBC at Usha Martin Ltd., Jamshedpur, Jharkhand.

    Boiler2007-08
  • #6Completed

    Thermax Limited, WWS Division, Pune

    Mechanical Erection of High Rate Filtration Plant at LD#01 - 2 Nos. inside Tata Steel Ltd., Jamshedpur.

    Mechanical2007-08
  • #7Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of 1 x 75 AFBC Boiler - 1 no. & 4 x 54.5 TPH WHRB Boiler and Plant piping at Bhushan Steel & Strips Ltd., Meeramandli, Angul, Odisha.

    BoilerPiping2008-09
  • #8Completed

    Thermax Instrumentation Ltd., Pune

    Erection & Commissioning Assistance of 35 TPH x 2 Nos. WHRB Boiler at Adhunik Alloy & Power Ltd., Kandra Site, Jharkhand.

    Boiler2008-09
  • #9Completed

    Indure Private Ltd., Usha Martin Site, Gamharia, Jamshedpur

    Erection of Main Steam line, Feed water line & Auxiliary piping at Usha Martin Ltd., Gamharia, Jamshedpur.

    Piping2008-09
  • #10Completed

    Alstom Project India Ltd., Delhi

    Erection of Boiler 2 x 230 TPH BFG/COG at PH#06 inside Tata Steel Ltd., Jharkhand.

    Boiler2008-10
  • #11Completed

    Tata Steel Ltd., Jamshedpur

    Dismantling of Coal Bunker and Boilers #05 & #06, Dismantling of ESP of Boiler #07, and Dismantling of Coal Bunker Building of Boilers #09 & #10 — all at Power House #03, Tata Steel Ltd., Jharkhand.

    DismantlingESP2009-10
  • #12Completed

    Tata Steel Ltd., Jamshedpur

    Erection of Re-Routing of Gas Pipeline (COG, Air Compressor, Tarcoal Line, Steam Line, Airline), Jamshedpur.

    Piping2009-10
  • #13Completed

    Tata Steel Ltd., Jamshedpur

    Erection of Railway Foot Over-Bridge at EPDG, Jamshedpur.

    Structural2009-10
  • #14Completed

    LOI Wesman Thermprocess Pvt. Ltd., Kolkata

    Erection & Commissioning of Batch Annealing Furnace.

    Mechanical2010-11
  • #15Completed

    Rashmi Cement Limited

    Erection & Commissioning of 4 x 10 TPH Waste Heat Recovery Boiler.

    Boiler2010-11
  • #16Completed

    Thermax Instrumentation Ltd., Pune

    Erection, Testing & Assistance during Commissioning of 1 x 240 TPH CFBC Boiler at IMFA, Cuttack, Orissa.

    Boiler2010-11
  • #17Completed

    DF Power System Pvt. Ltd.

    Erection, Testing & Assistance during Commissioning of 1 x 140 TPH CFBC Boiler & ESP (Phase-I) at Abhijeet Group, Saraikela, Jharkhand.

    BoilerESP2010-12
  • #18Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of 2 x 59.5 TPH WHRB, ESP & Piping (Phase-I) at Abhijeet Group, Saraikela, Jharkhand.

    BoilerESPPiping2010-12
  • #19Completed

    Usha Martin Limited (Usha Alloys & Steel Division), Gamharia, Seraikela-Kharsawan

    Erection & laying of Steam Pipe Line for SMS #III, Jharkhand.

    Piping2011-12
  • #20Completed

    Thyssenkrupp Industries India Pvt. Ltd., Pimpri, Pune

    Erection, Commissioning & Performance trial of 3 x 155 TPH CFBC Boiler with auxiliaries & ESP at Facor Power, Randia, Dist. Bhadrak, Odisha.

    BoilerESP2010-2014
  • #21Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection & Commissioning of 1 x 54.5 TPH CFBC Boiler at Ghantikhal, Cuttack, Orissa.

    Boiler2011-12
  • #22Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of ESP for 1 x 250 TPH CFBC Boiler at J.P. Churk, Dist. Sonebhadra, U.P.

    ESP2011-13
  • #23Completed

    Hamon Shriram Cottrell Pvt. Ltd., Goregaon (East), Mumbai

    Erection, Testing & Commissioning of ESP for Waste Gas Separation system of Sinter Plant #2, Tata Steel, Jamshedpur.

    ESP2011-13
  • #24Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection & Commissioning of 1 x 250 TPH CFBC Boiler at J.P. Churk, Dist. Sonebhadra, U.P.

    Boiler2011-13
  • #25Completed

    Thermax Instrumentation Ltd., Pune

    Erection & Assistance in Commissioning of 165 TPH CFBC Boiler along with ESP & Auxiliaries at J.K. Paper Ltd., Odisha.

    BoilerESP2012
  • #26Completed

    Thermax Instrumentation Ltd., Pune

    Erection & Assistance in Commissioning of 165 TPH CFBC Boiler along with Auxiliaries at J.K. Paper Ltd., Odisha.

    Boiler2012
  • #27Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of 2 x 59.5 TPH WHRB & Piping (Phase-II) at Abhijeet Projects Ltd., Saraikela, Jharkhand.

    BoilerPiping2012
  • #28Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection of 2 x 59.5 TPH WHRB, ESP & Piping (Phase-II) at Abhijeet Projects Ltd., Saraikela, Jharkhand.

    BoilerESPPiping2012-13
  • #29Completed

    DF Power System Pvt. Ltd., Bangalore

    Erection, Testing & Assistance during Commissioning of 1 x 140 TPH CFBC Boiler & ESP (Phase-II) at Abhijeet Group, Dist. Saraikela & Kharsawan, Jharkhand.

    BoilerESP2012-13
  • #30Completed

    Thyssenkrupp Industries India Pvt. Ltd., Pimpri, Pune

    Unloading, Erection & Commissioning of Wagon Tippler package at Facor Power, Randia, Dist. Bhadrak, Odisha.

    Mechanical2012-13
  • #31Completed

    Thermax Instrumentation Ltd., Pune

    Erection, Testing & Commissioning of 1 x 45 TPH AFBC + 1 x 35 TPH WHRB Boiler for the 1 x 20 MW CPP at KJS Ahluwalia Steel & Power Ltd., Barbil, Odisha.

    Boiler2012-13
  • #32Completed

    DF Power System Pvt. Ltd., Bangalore

    Erection, Testing & Assistance during Commissioning of 1 x 140 TPH CFBC Boiler & ESP at Abhijeet Group, Dist. Saraikela & Kharsawan, Jharkhand.

    BoilerESP2013
  • #33Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection & Commissioning of 1 x 250 TPH CFBC Boiler at J.P. Churk, Dist. Sonebhadra, U.P.

    Boiler2013
  • #34Completed

    Thermal System (Hyderabad) Pvt. Ltd., Hyderabad

    Unloading, Erection & Commissioning of 2 Nos. 65 TPH WHR Boiler at Usha Martin Ltd., Gamharia, Jamshedpur.

    Boiler2013-14
  • #35Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 150 TPH CFBC Boiler & its auxiliaries at Aditya Birla Chemicals Ltd., Dist. Palamu, Jharkhand.

    Boiler2013-14
  • #36Completed

    Thermal System (Hyderabad) Pvt. Ltd., Hyderabad

    Unloading, Erection & Commissioning of 2 Nos. 65 TPH WHR Boiler at Usha Martin Ltd., Gamharia, Jamshedpur.

    Boiler2013-14
  • #37Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 150 TPH CFBC Boiler & its auxiliaries at Aditya Birla Chemicals Ltd., Dist. Palamu, Jharkhand.

    Boiler2013-14
  • #38Completed

    D F Power System Pvt. Ltd., Bangalore

    Erection, Testing & Commissioning of Waste Heat Recovery Boiler Package (PH & AQC Boiler) with ESP & its Auxiliaries for 1 x 27.5 MW at Shree Raipur Cement Plant, Baloda Bazar, Raipur, C.G.

    BoilerESP2014-15
  • #39Completed

    D F Power System Pvt. Ltd., Bangalore

    Erection, Testing & Commissioning of Waste Heat Recovery Boiler Package (PH & AQC Boiler) & its Auxiliaries for 1 x 27.5 MW at Shree Raipur Cement Plant, Baloda Bazar, Raipur, C.G.

    Boiler2014-15
  • #40Completed

    Thermax Ltd., Enviro Division, Pune

    Up-gradation of 02 No. Bag Filter for F Blast Furnace Stock House at Tata Steel Ltd., Jamshedpur.

    Bag Filter2014-16
  • #41Completed

    Thermax Ltd., Enviro Division, Pune

    Dismantling, Erection & Commissioning of 08 No. ESP for 2 x 500 MW Boiler at NTPC Rihand Nagar, U.P.

    ESPDismantling2014-15
  • #42Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 215 TPH CFBC Boiler with ESP at Spectrum Coal & Power Ltd., Ratija, Korba, C.G.

    BoilerESP2015-16
  • #43Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 130 TPH CFBC Boiler with ESP at Emami Cement Ltd., Risda, Baloda Bazar, C.G.

    BoilerESP2015-16
  • #44Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 215 TPH CFBC Boiler & ESP at Spectrum Coal & Power Ltd., Ratija, Korba, C.G.

    BoilerESP2015-16
  • #45Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 130 TPH CFBC Boiler at Emami Cement Ltd., Risda, Baloda Bazar, C.G.

    Boiler2015-16
  • #46Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 100 TPH CFBC Boiler at Rashmi Metaliks Ltd., Kharagpur, W.B.

    Boiler2015-16
  • #47Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Commissioning of ESP for 2 x 300 TPH CFBC Boiler at HMEL, Bhatinda, Punjab.

    ESP2015-16
  • #48Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 175 TPH CFBC Boiler at Orissa Metaliks Pvt. Ltd., Kharagpur, W.B.

    Boiler2016-17
  • #49Completed

    Thermax Engg. Construction Co. Ltd., Pune

    Erection & Assistance in Commissioning of 1 x 136 TPH BFG Fired Boiler at Power House #4, Tata Steel Ltd., Jamshedpur.

    Boiler2016-17
  • #50Completed

    Tata Steel Ltd., Jamshedpur

    Overhead Yard Utility pipework for Replacement of Boiler at Power House #4, Tata Steel Ltd.

    Piping2016-17
  • #51Completed

    Tata Steel Ltd., Jamshedpur

    Up-gradation of Air Pollution Control Equipment, Balance Structural work at Tata Steel Ltd., Jamshedpur.

    Structural2016-17
  • #52Completed

    Tata Power Co. Ltd., Jamshedpur (IEL)

    Overhauling of Boiler & Washout at Tata Steel Ltd., Jamshedpur (2 x 60 MW).

    Boiler2016-17
  • #53Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 175 TPH CFBC Boiler at Orissa Metaliks Pvt. Ltd., Kharagpur, W.B.

    Boiler2016-17
  • #54Completed

    Tata Steel Ltd., Jamshedpur

    Conversion of all Boilers from Coal to LDO Firing at Power House #4 (Erection of Light Diesel Oil Storage and Distribution System, Boiler Burners & Auxiliaries) at Tata Steel Ltd., Jamshedpur.

    BoilerPiping2016-18
  • #55Completed

    Shakambari Ispat & Power Ltd., West Bengal

    Erection & Fabrication of 2 no. WHR Boiler & ESP for 40 MW Power Plant at Shakambhari Ispat & Power Ltd., Purulia, West Bengal.

    BoilerESP2017-18
  • #56Completed

    Isgec Heavy Engineering Ltd., Noida

    Erection & Assistance in Commissioning of 1 x 100 TPH CFBC Boiler at Shakambari Ispat & Power Ltd., Purulia, West Bengal.

    Boiler2017-18
  • #57Completed

    Thermax Ltd., Enviro Division, Pune

    Dismantling, Erection & Commissioning of Waste Gas Cleaning System 04 No. (Bag Filter) for Lime Plant (MK-1, MK-2, MK-3, MK-4) & 01 No. at LD#1, DE#1 at Tata Steel Ltd., Jamshedpur.

    Bag FilterDismantling2017-18
  • #58Completed

    Tata Power Co. Ltd., Jamshedpur (IEL)

    Overhauling of Boiler & Washout at Tata Steel Ltd., Jamshedpur (2 x 60 MW).

    Boiler2017-18
  • #59Completed

    Tata Steel Ltd., Jamshedpur

    Assembly, Erection, Alignment of APC Equipment for Sinter Plant #2 (Dismantling of 01 no. old ESP and Erection of 01 no. Bag Filter & 01 no. ESP) at Tata Steel Ltd., Jamshedpur.

    ESPBag FilterDismantling2017-18
  • #60Completed

    Tata Steel Ltd., Jamshedpur

    Fabrication and Supply of Ducts, Hoods and Bends for Air Pollution Control Project at Tata Steel Ltd., Jamshedpur.

    Structural2017-19
  • #61Completed

    Tata Steel Ltd., Jamshedpur

    Assembly, Erection, Alignment of APC Equipment for Sinter Plant #1 (Dismantling of 01 no. old ESP and Erection of 02 no. Bag Filter & 01 no. ESP) at Tata Steel Ltd., Jamshedpur.

    ESPBag FilterDismantling2018-19
  • #62Completed

    Thyssenkrupp Industries India Pvt. Ltd., Pune

    Erection & Assistance in Commissioning of 1 x 80 TPH Paddy Straw Boiler at Sukhbir Agro Energy Ltd., Faridkot, Punjab.

    Boiler2018-19
  • #63Completed

    Thyssenkrupp Industries India Pvt. Ltd., Pune

    Erection & Assistance in Commissioning of 1 x 80 TPH Paddy Straw Boiler at Sukhbir Agro Energy Ltd., Faridkot, Punjab.

    Boiler2018-19
  • #64Completed

    Thermax Ltd., Boiler & Heater Division, Pune

    Erection & Assistance in Commissioning of ESP for 2 x 34 TPH WHR Boiler at Shyam Sel & Power Ltd., Jamuria, West Bengal.

    ESP2018-19
  • #65Completed

    Hamon Research Cottrell India Pvt. Ltd., Chennai

    Renovation & Retrofitting of ESP at NTPC Farakka Super Thermal Power Station for 2 x 500 MW Power Plant, West Bengal (8 Pass).

    ESP2018-19
  • #66Completed

    Thermax Limited, Enviro Division, Pune

    Installation & Commissioning of 01 No. ESP at JSW Steel Ltd., Dolvi, Raigad, Maharashtra.

    ESP2018-19
  • #67Completed

    Tata Steel Ltd., Jamshedpur

    Fabrication of Fittings and Appurtenance, Erection job for conversion of Boiler-2 from Coal to LDO firing at PH#4, TSL, Jamshedpur.

    BoilerPiping2019-20
  • #68Completed

    Tata Steel Bhushan Steel Ltd., Angul, Odisha

    Revamping of Pressure Parts for 1 x 275 TPH CFBC Boiler along with schedule of Line Walk at Tata Steel Bhushan Steel Ltd., Dhenkanal, Angul, Odisha.

    Boiler2019-20
  • #69Completed

    Tata Steel Long Product Ltd., Gomardih, Odisha

    Dismantling of Structure & Equipment at Crusher Plant, Gomardih, Tata Steel Ltd., Odisha.

    DismantlingStructural2020-21
  • #70Completed

    Vedanta (Facor Power Ltd.), Odisha

    Mechanical & Insulation job for Boiler #3 — Completion & Commissioning at Bhadrak, Odisha.

    BoilerMechanical2021-22
  • #71Completed

    Mitsubishi Power India Pvt. Ltd., Bangalore

    Mechanical work for Interconnection Duct & Bypass Damper for FGD Project at NTPC Farakka, Murshidabad, West Bengal.

    FGD2022-23
  • #72Completed

    Thermax Ltd., P&ES, FGD Division, Pune

    Fabrication & Erection of EQT Structure, EQT Tank Erection, Absorber & its internals job for FGD project (2 x 500 MW) at Damodar Valley Corporation, Koderma, Jharkhand.

    FGDStructural2022-23
  • #73Completed

    L&T Energy-Power, Vadodara, Gujarat

    Erection of Circular Absorber for Unit-1, 2, 3 & 4 (4 x 210 MW) and Unit-5 & 6 (2 x 250 MW), FGD Project at DVC, Mejia Thermal Power Station, Bankura, West Bengal.

    FGD2023-24
  • #74Completed

    Thermax Babcock and Wilcox Energy Solution Ltd., Pune

    Modification of Fuel Firing System at PH#4 at Tata Steel Ltd., Jamshedpur.

    Boiler2023-24
  • #75Completed

    Pennar Industries Limited, Thanjavur, Tamil Nadu

    Erection & Commissioning of 2 x 11 TPH WHR Boiler at BDG Steel & Power Pvt. Ltd., Bankura, West Bengal.

    Boiler2025-26
  • #76Completed

    Thermal Systems (HYD) Pvt. Ltd., Hyderabad

    Erection & Commissioning of 1 x 53.6 TPH WHR Boiler at BDG Steel & Power Pvt. Ltd., Bankura, West Bengal.

    Boiler2025-26
  • #77Completed

    Essar Construction India Limited

    Fabrication, Erection, Alignment, Surface Preparation and Painting work of SMS at JSL, Jajpur, Odisha.

    Structural2024-25
  • #78Completed

    PES Engineers Private Limited

    Erection of Absorbers in all respect at Singareni Thermal Power Plant, Stage-1, Pegadapalli (Vill), Jaipur (Mandal), Mancherial Dist., Telangana.

    FGD2023-25
  • #79Completed

    PES Engineers Private Limited

    Fabrication of Absorber Cone & Shell Plates at Singareni Thermal Power Plant, Stage-1, Pegadapalli (Vill), Jaipur (Mandal), Mancherial Dist., Telangana.

    FGD2023-25
  • #80Under Progress

    Isgec Heavy Engineering Ltd., Noida, U.P.

    Mechanical work of Absorber (FGD) at OPGC, Jharsuguda, Odisha.

    FGD2025-26
  • #81Under Progress

    Shri Bajrang Power and Ispat Ltd., Raipur

    Erection & Commissioning of 1 x 160 TPH CFBC Boiler at Shri Bajrang Power & Ispat Ltd., Tilda, Raipur, C.G.

    Boiler2026
  • #82Under Progress

    Rungta Sons Pvt. Ltd., Seraikela, Jharkhand

    Revamping of 1 x 140 TPH CFBC Boiler & 2 x 59.6 TPH WHR Boiler at Seraikela Steel Plant, Seraikela, Jharkhand.

    Boiler2026