Six disciplines, executed in-house
Each capability below is drawn from work we have actually delivered. The project counts are live from our record of 82 jobs.
Boiler Erection & Auxiliaries
Complete boiler erection — pressure and non-pressure parts — from 10 TPH WHRBs to 275 TPH CFBC units.
- Complete erection of boilers including pressure & non-pressure parts
- Alignment, leveling, and final fit-up with tight tolerances
- Handling of pending / balance works from previous contractors
- Shutdown execution with strict timelines
52 projects executed in this discipline

Rungta Sons Pvt. Ltd., Seraikela, Jharkhand
Revamping of 1 x 140 TPH CFBC Boiler & 2 x 59.6 TPH WHR Boiler at Seraikela Steel Plant, Seraikela, Jharkhand.
2026 · Under Progress
Shri Bajrang Power and Ispat Ltd., Raipur
Erection & Commissioning of 1 x 160 TPH CFBC Boiler at Shri Bajrang Power & Ispat Ltd., Tilda, Raipur, C.G.
2026 · Under Progress
Thermal Systems (HYD) Pvt. Ltd., Hyderabad
Erection & Commissioning of 1 x 53.6 TPH WHR Boiler at BDG Steel & Power Pvt. Ltd., Bankura, West Bengal.
2025-26 · Completed
Pennar Industries Limited, Thanjavur, Tamil Nadu
Erection & Commissioning of 2 x 11 TPH WHR Boiler at BDG Steel & Power Pvt. Ltd., Bankura, West Bengal.
2025-26 · Completed
ESP (Electrostatic Precipitator) Works
Full-scale ESP erection, plus revamping and rectification of defective installations.
- Full-scale erection including casing, internals, electrodes & hopper systems
- Structural integration and duct connectivity
- Expertise in revamping, modification, and rectification of defective installations
23 projects executed in this discipline

Thermax Limited, Enviro Division, Pune
Installation & Commissioning of 01 No. ESP at JSW Steel Ltd., Dolvi, Raigad, Maharashtra.
2018-19 · Completed
Hamon Research Cottrell India Pvt. Ltd., Chennai
Renovation & Retrofitting of ESP at NTPC Farakka Super Thermal Power Station for 2 x 500 MW Power Plant, West Bengal (8 Pass).
2018-19 · Completed
Thermax Ltd., Boiler & Heater Division, Pune
Erection & Assistance in Commissioning of ESP for 2 x 34 TPH WHR Boiler at Shyam Sel & Power Ltd., Jamuria, West Bengal.
2018-19 · Completed
Tata Steel Ltd., Jamshedpur
Assembly, Erection, Alignment of APC Equipment for Sinter Plant #1 (Dismantling of 01 no. old ESP and Erection of 02 no. Bag Filter & 01 no. ESP) at Tata Steel Ltd., Jamshedpur.
2018-19 · Completed
FGD — Flue Gas Duct with Absorber
Heavy-duty flue gas ducts and absorber tanks, including circular absorbers for 660 MW units.
- Detailed fabrication and erection of heavy-duty flue gas ducts, including Absorber Tanks
- Assembly and installation of absorber structures, internals, and associated equipment
- Installation of dampers, expansion joints, liners, supports, and hangers
- Site modifications, fitment adjustments, and alignment corrections as per actual site conditions
- Inspection, testing, and quality checks in line with project specifications
- Heavy duct fabrication & erection including large cross-section flue gas ducts
- Site modification capability to suit actual conditions
6 projects executed in this discipline

Isgec Heavy Engineering Ltd., Noida, U.P.
Mechanical work of Absorber (FGD) at OPGC, Jharsuguda, Odisha.
2025-26 · Under Progress
PES Engineers Private Limited
Fabrication of Absorber Cone & Shell Plates at Singareni Thermal Power Plant, Stage-1, Pegadapalli (Vill), Jaipur (Mandal), Mancherial Dist., Telangana.
2023-25 · Completed
PES Engineers Private Limited
Erection of Absorbers in all respect at Singareni Thermal Power Plant, Stage-1, Pegadapalli (Vill), Jaipur (Mandal), Mancherial Dist., Telangana.
2023-25 · Completed
L&T Energy-Power, Vadodara, Gujarat
Erection of Circular Absorber for Unit-1, 2, 3 & 4 (4 x 210 MW) and Unit-5 & 6 (2 x 250 MW), FGD Project at DVC, Mejia Thermal Power Station, Bankura, West Bengal.
2023-24 · Completed
Bag Filter Systems
Complete bag house assemblies, integrated with ducting in brownfield and space-constrained conditions.
- Complete erection of bag house assemblies
- Integration with ducting and supporting structures
- Execution in brownfield / space-constrained conditions
4 projects executed in this discipline

Tata Steel Ltd., Jamshedpur
Assembly, Erection, Alignment of APC Equipment for Sinter Plant #1 (Dismantling of 01 no. old ESP and Erection of 02 no. Bag Filter & 01 no. ESP) at Tata Steel Ltd., Jamshedpur.
2018-19 · Completed
Tata Steel Ltd., Jamshedpur
Assembly, Erection, Alignment of APC Equipment for Sinter Plant #2 (Dismantling of 01 no. old ESP and Erection of 01 no. Bag Filter & 01 no. ESP) at Tata Steel Ltd., Jamshedpur.
2017-18 · Completed
Thermax Ltd., Enviro Division, Pune
Dismantling, Erection & Commissioning of Waste Gas Cleaning System 04 No. (Bag Filter) for Lime Plant (MK-1, MK-2, MK-3, MK-4) & 01 No. at LD#1, DE#1 at Tata Steel Ltd., Jamshedpur.
2017-18 · Completed
Thermax Ltd., Enviro Division, Pune
Up-gradation of 02 No. Bag Filter for F Blast Furnace Stock House at Tata Steel Ltd., Jamshedpur.
2014-16 · Completed
Structural Works
Heavy load-bearing structures, equipment supporting frames, platforms and access systems.
- Fabrication & erection of heavy load-bearing structures
- Equipment supporting frames, platforms, and access systems
- Capability to execute non-standard / site-modified structures
6 projects executed in this discipline

Essar Construction India Limited
Fabrication, Erection, Alignment, Surface Preparation and Painting work of SMS at JSL, Jajpur, Odisha.
2024-25 · Completed
Thermax Ltd., P&ES, FGD Division, Pune
Fabrication & Erection of EQT Structure, EQT Tank Erection, Absorber & its internals job for FGD project (2 x 500 MW) at Damodar Valley Corporation, Koderma, Jharkhand.
2022-23 · Completed
Tata Steel Long Product Ltd., Gomardih, Odisha
Dismantling of Structure & Equipment at Crusher Plant, Gomardih, Tata Steel Ltd., Odisha.
2020-21 · Completed
Tata Steel Ltd., Jamshedpur
Fabrication and Supply of Ducts, Hoods and Bends for Air Pollution Control Project at Tata Steel Ltd., Jamshedpur.
2017-19 · Completed
Piping Works
Utility and process piping — fabrication, fit-up, hydro-testing and commissioning support.
- Fabrication & erection of utility & process piping systems
- Fit-up, alignment, hydro-testing & commissioning support
- Capability to handle critical routing and modification works
10 projects executed in this discipline

Tata Steel Ltd., Jamshedpur
Fabrication of Fittings and Appurtenance, Erection job for conversion of Boiler-2 from Coal to LDO firing at PH#4, TSL, Jamshedpur.
2019-20 · Completed
Tata Steel Ltd., Jamshedpur
Conversion of all Boilers from Coal to LDO Firing at Power House #4 (Erection of Light Diesel Oil Storage and Distribution System, Boiler Burners & Auxiliaries) at Tata Steel Ltd., Jamshedpur.
2016-18 · Completed
Tata Steel Ltd., Jamshedpur
Overhead Yard Utility pipework for Replacement of Boiler at Power House #4, Tata Steel Ltd.
2016-17 · Completed
Thermax Engg. Construction Co. Ltd., Pune
Erection of 2 x 59.5 TPH WHRB, ESP & Piping (Phase-II) at Abhijeet Projects Ltd., Saraikela, Jharkhand.
2012-13 · Completed
Safety & quality approach
We understand that execution speed without control leads to failure. Hence, we maintain:
- Strict adherence to site safety protocols
- Controlled execution with experienced supervisors
- Quality checks at every critical stage
Have a package that has to move?
Send us the scope and the date it has to be handed over. We will tell you what it takes to hit it — and mobilise within days, not weeks.